Catalogue IMPORTANT SALE INFORMATION

SALE CLOSED: Contents of Ken Muir Fruit Farm in Clacton-On-Sea (#1724) 1:00 AM 18/10/23 CEST - 4:46 PM 07/11/23 CET Closed

Bidding Ends From 3:40 PM CET - 07/11/2023

Auction Info
>

Lot 3045m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site.

Click image to enlarge
Lot closed - Winning bid:N/A

 

  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site.
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 2
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 3
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 4
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 5
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 6
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 7
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 8
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 9
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 10
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 11
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 12
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 13
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 14
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 15
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 16
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 17
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 18
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 19
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 20
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 21
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 22
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 23
  • 45m Twin Span Poly Tunnel with Galvanized Frame. Overall Size 45m x 16m x 4m. NOTE: buyer is responsible for the dismantle & collection from site. - 24